Technical specifications
Published reference data for the vehicle discussed in this guide. Confirm the selected build in the supplier’s specification.
| Parameter | Published value |
|---|---|
| Vehicle model | HYS5124TFZE6 |
| Chassis | Dongfeng EQ1182GSZ6DJ |
| Gross vehicle mass | 12,005 kg |
| Curb mass | 11,680 kg |
| Crew seating | 2 + 3 |
| Engine | Dongfeng Cummins D4.0NS6B195 |
| Engine power | 143 kW |
| Body equipment | Attenuator assembly and internal ballast |
Applications and route planning
Road maintenance contractors use attenuator vehicles as part of a managed traffic-control plan. This Dongfeng double-cab reference provides a rear attenuator assembly and a ballasted body. The route environment, traffic conditions and authority requirements determine the equipment package and deployment method; the vehicle is one element of the wider work-zone arrangement.
Understanding the technical specification
The supplier’s product title uses a 100K designation, but that wording alone is not proof of a recognised crash-test approval. This listing therefore identifies the vehicle and chassis without making a certified impact-speed claim. Request the exact attenuator model, test report, installation instructions and compatible host-vehicle mass range.
Configuration and quotation checklist
Provide the road authority’s required standard, work-zone layout and lighting specification. Confirm that ballast, chassis mass and the mounted attenuator match the tested installation requirements. Obtain a written equipment list for arrow boards, beacons, cameras and other warning devices rather than assuming the photographed configuration is standard.
Maintenance, inspection and handover
Ask for daily inspection points, damage assessment instructions and replacement-module availability. The operator should have the manufacturer’s mounting and deployment documentation. Plan repair support for the attenuator before placing the vehicle into service.
Ordering for your destination
Send your destination country, preferred chassis support network and required delivery location with the vehicle brief. Ask for a dated quotation that separates the chassis, specialist body, equipment, inspection, spare parts and freight. Confirm the deposit, production milestones and shipment documents in the contract. Transit time and import costs depend on the agreed route and destination; they are not fixed by this reference guide.
Reference scope
The figures describe the published reference, not every configuration. Final chassis, body equipment, permitted payload, destination requirements, delivery schedule and price are confirmed in a written quotation.



